© 2011 PH powalog_sitework_diggin

Diggin

Digging’s happening. Slab footprint is emerging.

At the edge of the growing hole in the ground, sized for a hybrid superinsulated-slab-on-grade foundation, the worksite office hugs the last 13 feet of yard left to the south of the pit. Not much room to swing an excavator in this tight urban site.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>